UNSW’s Barker Street Housing Plans Would Reshape Kensington Campus

A stretch of Barker Street on the southern edge of UNSW’s Kensington campus could undergo a substantial change, with the university proposing to replace its existing student residences with three new accommodation buildings.



The redevelopment proposed for 39 Barker Street would bring five residential colleges together within a precinct designed to accommodate hundreds more students than the buildings currently occupying the site. According to UNSW’s 2025 annual report, the existing residences contain 260 beds. The latest NSW planning exhibition description lists 766 proposed student beds and 15 non-student accommodation units. The proposal is open for public submissions until 26 November 2026.

development proposed
Photo Credit: SSD-84220206

From Existing Residences To A New College Precinct

The Barker Street redevelopment would replace existing accommodation with buildings incorporating residential colleges, shared facilities and landscaped outdoor areas. UNSW’s published project plans include dedicated women’s and Indigenous colleges, along with self-contained accommodation and communal facilities intended to support university life beyond student bedrooms.

Dining and study spaces would sit alongside wellness, cultural and music facilities. The design also includes courtyards, pedestrian connections, bicycle storage and laundries. The proposed layout would alter the southern campus precinct, with changes to Southern Drive and access arrangements involving Gate 15 also outlined in the university’s project information.

Industry Veteran
Industry Veteran
student accommodation
Photo Credit: SSD-84220206

UNSW has identified a shortage of dedicated student accommodation around Kensington as one reason for pursuing the redevelopment. Its existing housing arrangements include residential colleges and independent apartments, with the Barker Street site identified for expansion.

The university has also linked the project to pressure on the surrounding private rental market. It expects additional university accommodation to reduce the number of students seeking housing in nearby suburbs, although the extent of any effect on rents or availability has not been established.

UNSW Barker Street Proposal

Student beds proposed
766
New buildings
3
Residential colleges
5
Non-student accommodation units
15
Public exhibition closes: 26 November 2026

View application SSD-84220206

Figures reflect the current NSW Planning Portal exhibition description. The development is proposed and has not been approved.

Building Scale And Neighbouring Properties

The proposed expansion has also prompted questions about how the new buildings would fit along Barker Street, where the university campus meets surrounding residential properties. Randwick City Council has raised concerns about the height of buildings facing the street and the potential for winter overshadowing of neighbouring homes.

Its planning submission also addresses pedestrian access, while identifying positive aspects of the separation between the proposed buildings and the landscaped areas incorporated into the design. Other submissions have addressed vehicle access around Gate 15 and servicing arrangements. The planning records also contain support for the development, subject to changes.

UNSW student housing
Photo Credit: SSD-84220206

The project was declared State Significant Development in May 2025, bringing it under the NSW Government’s state planning assessment process. The declaration established the pathway for assessment but did not provide permission to build. UNSW’s published project information previously outlined 732 student beds and 30 non-student beds, while the latest exhibition description records 766 student beds and 15 non-student accommodation units. The figures relate to different published versions of the proposal.



The university would develop the accommodation and oversee its operation with affiliated organisations if approval is granted. The application, SSD-84220206, remains open for public submissions through the NSW Planning Portal until 26 November 2026.

Published 18-November-2026



Mobile Ad